Facilities Planning

Facilities Maintenance Plan for 2021-2022

Building Committee: Phil Booth (chair); David Wood; Chris Boudreau; David Kanclerz; David James; Janeen Bodary; Richard Marengere; Paul Vandevert; John Sczomak (President)

Facilities Maintenance Goal – the Players Guild building and grounds should be safe, comfortable, and energy efficient.

Projects

  • East Parking Lot Renovation
  • Re-flooring of Sub-basement
  • Replace Roof over costume room area
  • Replace show curtains
  • Replace fluorescent lighting with LED lighting (ongoing)
  • Reconstitute attic space
  • Replace costume room door
  • Ramp and lobby renovation
  • Paint building exterior
  • Fly rail replacements (ongoing)
  • Upgrade hearing assists

Accomplishments 2021-2022

  • Replaced back stage wall
  • Replaced stage floor
  • Upgraded show picture and information boards to video monitors